830 Artikel
Åndberget (286 MW wind power) is back online after maintenance.
Turinge Energi AB plant (241 MW wind power) is back online after maintenance.
Letsi kraftverk (146 MW hydropower) is back online after outage.
Turinge Energi AB plant (241 MW wind power) is operating at reduced capacity. Capacity loss: 118 MW. Period: Nov 19, 2026 – Nov 19, 2026.
Åndberget (286 MW wind power) is taken offline. Capacity loss: 286 MW. Period: Nov 19, 2026 – Nov 19, 2026.
Letsi kraftverk (146 MW hydropower) is taken offline. Capacity loss: 146 MW. Period: Nov 19, 2026 – Nov 19, 2026.
Total hydropower production in Sweden reached 12830 MW, the highest so far this year (previous high: 12776 MW, +0.4%).
Stornorrfors (602 MW hydropower) is back online after maintenance.
Forsmark 3 (1172 MW nuclear power) is back online after maintenance.
Harsprångets kraftverk (170 MW hydropower) is back online after outage.
Kilberget (259 MW wind power) is back online after maintenance.
Kallamossen (374 MW wind power) is back online after maintenance.
Gråberget (270 MW wind power) is back online after maintenance.
Dal (380 MW wind power) is back online after maintenance.
Kilforsen (272 MW hydropower) is back online after maintenance.
2 (253 MW wind power) is back online after maintenance.
Kilforsen (272 MW hydropower) is operating at reduced capacity. Capacity loss: 178 MW. Period: Nov 18, 2026 – Nov 18, 2026.
Messaure kraftverk (428 MW hydropower) is back online after maintenance.
2 (253 MW wind power) is operating at reduced capacity. Capacity loss: 123 MW. Period: Nov 18, 2026 – Nov 18, 2026.
Messaure kraftverk (428 MW hydropower) is taken offline. Capacity loss: 428 MW. Period: Nov 18, 2026 – Nov 18, 2026.