Ligga — planned maintenance May 20, 2026 – May 20, 2026
Ligga (320 MW hydropower) is operating at reduced capacity. Capacity loss: 170 MW. Period: May 20, 2026 – May 20, 2026.
Ligga
Ligga in Norrbottens län, bidding zone SE1, has reported planned maintenance.
- Type: planned maintenance
- Source: hydropower
- Nominal capacity: 320 MW
- Available capacity: 150 MW
- Capacity loss: 170 MW
- Period: May 20, 2026 – May 20, 2026
Reason: failure