Åmot-Lingbo Vindkraft AB plant — planned maintenance May 21, 2026 – Jun 05, 2026
Åmot-Lingbo Vindkraft AB plant (249 MW wind power) is operating at reduced capacity. Capacity loss: 103 MW. Period: May 21, 2026 – Jun 05, 2026.
Åmot-Lingbo Vindkraft AB plant
Åmot-Lingbo Vindkraft AB plant in Gävleborgs län, bidding zone SE2, has reported planned maintenance.
- Type: planned maintenance
- Source: wind power
- Nominal capacity: 249 MW
- Available capacity: 146 MW
- Capacity loss: 103 MW
- Period: May 21, 2026 – Jun 05, 2026
Reason: Full outage due to grid works. Vestas will ramp down production by approx. 5-6 turbines each day from 21.5 to 25.5.