Ligga — planned maintenance May 25, 2026 – May 25, 2026

Ligga (320 MW hydropower) is operating at reduced capacity. Capacity loss: 179 MW. Period: May 25, 2026 – May 25, 2026.

Ligga

Ligga in Norrbottens län, bidding zone SE1, has reported planned maintenance.

  • Type: planned maintenance
  • Source: hydropower
  • Nominal capacity: 320 MW
  • Available capacity: 141 MW
  • Capacity loss: 179 MW
  • Period: May 25, 2026 – May 25, 2026

Reason: Failure.

View Ligga on map →