Åmot-Lingbo Vindkraft AB plant — planned maintenance Jun 05, 2026 – Jun 10, 2026

Åmot-Lingbo Vindkraft AB plant (249 MW wind power) is taken offline. Capacity loss: 249 MW. Period: Jun 05, 2026 – Jun 10, 2026.

Åmot-Lingbo Vindkraft AB plant

Åmot-Lingbo Vindkraft AB plant in Gävleborgs län, bidding zone SE2, has reported planned maintenance.

  • Type: planned maintenance
  • Source: wind power
  • Nominal capacity: 249 MW
  • Available capacity: 0 MW
  • Capacity loss: 249 MW
  • Period: Jun 05, 2026 – Jun 10, 2026

Reason: Ramp up after this UMM job: https://umm.nordpoolgroup.com/#/messages/7213dfc2-423f-4c94-b9ba-f5065067d4da/3

View Åmot-Lingbo Vindkraft AB plant on map →