Åmot-Lingbo Vindkraft AB plant — planned maintenance Jun 05, 2026 – Jun 10, 2026
Åmot-Lingbo Vindkraft AB plant (249 MW wind power) is taken offline. Capacity loss: 249 MW. Period: Jun 05, 2026 – Jun 10, 2026.
Åmot-Lingbo Vindkraft AB plant
Åmot-Lingbo Vindkraft AB plant in Gävleborgs län, bidding zone SE2, has reported planned maintenance.
- Type: planned maintenance
- Source: wind power
- Nominal capacity: 249 MW
- Available capacity: 0 MW
- Capacity loss: 249 MW
- Period: Jun 05, 2026 – Jun 10, 2026
Reason: Ramp up after this UMM job: https://umm.nordpoolgroup.com/#/messages/7213dfc2-423f-4c94-b9ba-f5065067d4da/3