Åmot-Lingbo Vindkraft AB plant — planned maintenance Aug 01, 2026 – Aug 01, 2026
Åmot-Lingbo Vindkraft AB plant (249 MW wind power) is taken offline. Capacity loss: 249 MW. Period: Aug 01, 2026 – Aug 01, 2026.
Åmot-Lingbo Vindkraft AB plant
Åmot-Lingbo Vindkraft AB plant in Gävleborgs län, bidding zone SE2, has reported planned maintenance.
- Type: planned maintenance
- Source: wind power
- Nominal capacity: 249 MW
- Available capacity: 0 MW
- Capacity loss: 249 MW
- Period: Aug 01, 2026 – Aug 01, 2026
Reason: Problems with control system