Letsi kraftverk — planned maintenance Aug 04, 2026 – Aug 05, 2026
Letsi kraftverk (474 MW hydropower) is taken offline. Capacity loss: 474 MW. Period: Aug 04, 2026 – Aug 05, 2026.
Letsi kraftverk
Letsi kraftverk in Norrbottens län, bidding zone SE1, has reported planned maintenance.
- Type: planned maintenance
- Source: hydropower
- Nominal capacity: 474 MW
- Available capacity: 0 MW
- Capacity loss: 474 MW
- Period: Aug 04, 2026 – Aug 05, 2026
Reason: Maintenance