2 — planned maintenance Aug 22, 2026 – Sep 07, 2026
2 (253 MW wind power) is operating at reduced capacity. Capacity loss: 127 MW. Period: Aug 22, 2026 – Sep 07, 2026.
2
2 in Västra Götalands län, bidding zone PITEÅ, has reported planned maintenance.
- Type: planned maintenance
- Source: wind power
- Nominal capacity: 253 MW
- Available capacity: 126 MW
- Capacity loss: 127 MW
- Period: Aug 22, 2026 – Sep 07, 2026
Reason: Ellevio Gridworks, Enercon maintenance and grid maintenance.