Rya KVV — planned maintenance Sep 04, 2026 – Sep 29, 2026
Rya KVV (260 MW gas) is operating at reduced capacity. Capacity loss: 170 MW. Period: Sep 04, 2026 – Sep 29, 2026.
Rya KVV
Rya KVV in None, bidding zone SE3, has reported planned maintenance.
- Type: planned maintenance
- Source: gas
- Nominal capacity: 260 MW
- Available capacity: 90 MW
- Capacity loss: 170 MW
- Period: Sep 04, 2026 – Sep 29, 2026
Reason: Anual Maintenance Gasturbine 3 and Steamturbine