Gallejaur — unplanned outage Sep 30, 2026 – Sep 30, 2026
Gallejaur (101 MW hydropower) is taken offline. Capacity loss: 101 MW. Period: Sep 30, 2026 – Sep 30, 2026.
Gallejaur
Gallejaur in None, bidding zone SE1, has reported unplanned outage.
- Type: unplanned outage
- Source: hydropower
- Nominal capacity: 101 MW
- Available capacity: 0 MW
- Capacity loss: 101 MW
- Period: Sep 30, 2026 – Sep 30, 2026
Reason: Failure.