Trängslet — unplanned outage Sep 04, 2026 – Sep 04, 2026

Trängslet (130 MW hydropower) is taken offline. Capacity loss: 130 MW. Period: Sep 04, 2026 – Sep 04, 2026.

Gasturbiner Halmstad back online after outage

Gasturbiner Halmstad (200 MW gas) is back online after outage.

Letsi kraftverk back online after outage

Letsi kraftverk (146 MW hydropower) is back online after outage.

Ligga back online after maintenance

Ligga (320 MW hydropower) is back online after maintenance.

Ligga — planned maintenance Sep 03, 2026 – Sep 03, 2026

Ligga (320 MW hydropower) is taken offline. Capacity loss: 320 MW. Period: Sep 03, 2026 – Sep 03, 2026.

Hydropower hits 2026 Sweden-wide high: 14237 MW

Total hydropower production in Sweden reached 14237 MW, the highest so far this year (previous high: 12776 MW, +11.4%).

Ringhals 4 — planned maintenance Sep 01, 2026 – Oct 15, 2026

Ringhals 4 (1134 MW nuclear power) is taken offline. Capacity loss: 1134 MW. Period: Sep 01, 2026 – Oct 15, 2026.

Ringhals 4 back online after outage

Ringhals 4 (569 MW nuclear power) is back online after outage.

Seitevare Kraftstation back online after maintenance

Seitevare Kraftstation (201 MW hydropower) is back online after maintenance.

Seitevare Kraftstation — planned maintenance Sep 01, 2026 – Sep 01, 2026

Seitevare Kraftstation (201 MW hydropower) is taken offline. Capacity loss: 201 MW. Period: Sep 01, 2026 – Sep 01, 2026.

Värtaverket — unplanned outage Sep 01, 2026 – Sep 04, 2026

Värtaverket (130 MW biomass) is taken offline. Capacity loss: 130 MW. Period: Sep 01, 2026 – Sep 04, 2026.

Letsi kraftverk — unplanned outage Aug 31, 2026 – Sep 03, 2026

Letsi kraftverk (146 MW hydropower) is taken offline. Capacity loss: 146 MW. Period: Aug 31, 2026 – Sep 03, 2026.

Ligga — unplanned outage Aug 31, 2026 – Oct 09, 2026

Ligga (173 MW hydropower) is taken offline. Capacity loss: 173 MW. Period: Aug 31, 2026 – Oct 09, 2026.

Öresundsverket — planned maintenance Aug 28, 2026 – Nov 20, 2026

Öresundsverket (450 MW gas) is taken offline. Capacity loss: 450 MW. Period: Aug 28, 2026 – Nov 20, 2026.

Trängslet back online after maintenance

Trängslet (330 MW hydropower) is back online after maintenance.

Trängslet back online after outage

Trängslet (100 MW hydropower) is back online after outage.

Letsi kraftverk back online after outage

Letsi kraftverk (146 MW hydropower) is back online after outage.

Trängslet — unplanned outage Aug 28, 2026 – Aug 28, 2026

Trängslet (100 MW hydropower) is taken offline. Capacity loss: 100 MW. Period: Aug 28, 2026 – Aug 28, 2026.

Gallejaur back online after maintenance

Gallejaur (207 MW hydropower) is back online after maintenance.

Gallejaur — planned maintenance Aug 28, 2026 – Aug 28, 2026

Gallejaur (207 MW hydropower) is taken offline. Capacity loss: 207 MW. Period: Aug 28, 2026 – Aug 28, 2026.