Hendelser

830 artikler

Åndberget back online after maintenance

Åndberget (286 MW wind power) is back online after maintenance.

Turinge Energi AB plant back online after maintenance

Turinge Energi AB plant (241 MW wind power) is back online after maintenance.

Letsi kraftverk back online after outage

Letsi kraftverk (146 MW hydropower) is back online after outage.

Turinge Energi AB plant — planned maintenance Nov 19, 2026 – Nov 19, 2026

Turinge Energi AB plant (241 MW wind power) is operating at reduced capacity. Capacity loss: 118 MW. Period: Nov 19, 2026 – Nov 19, 2026.

Åndberget — planned maintenance Nov 19, 2026 – Nov 19, 2026

Åndberget (286 MW wind power) is taken offline. Capacity loss: 286 MW. Period: Nov 19, 2026 – Nov 19, 2026.

Letsi kraftverk — unplanned outage Nov 19, 2026 – Nov 19, 2026

Letsi kraftverk (146 MW hydropower) is taken offline. Capacity loss: 146 MW. Period: Nov 19, 2026 – Nov 19, 2026.

Hydropower hits 2026 Sweden-wide high: 12830 MW

Total hydropower production in Sweden reached 12830 MW, the highest so far this year (previous high: 12776 MW, +0.4%).

Stornorrfors back online after maintenance

Stornorrfors (602 MW hydropower) is back online after maintenance.

Forsmark 3 back online after maintenance

Forsmark 3 (1172 MW nuclear power) is back online after maintenance.

Harsprångets kraftverk back online after outage

Harsprångets kraftverk (170 MW hydropower) is back online after outage.

Kilberget back online after maintenance

Kilberget (259 MW wind power) is back online after maintenance.

Kallamossen back online after maintenance

Kallamossen (374 MW wind power) is back online after maintenance.

Gråberget back online after maintenance

Gråberget (270 MW wind power) is back online after maintenance.

Dal back online after maintenance

Dal (380 MW wind power) is back online after maintenance.

Kilforsen back online after maintenance

Kilforsen (272 MW hydropower) is back online after maintenance.

2 back online after maintenance

2 (253 MW wind power) is back online after maintenance.

Kilforsen — planned maintenance Nov 18, 2026 – Nov 18, 2026

Kilforsen (272 MW hydropower) is operating at reduced capacity. Capacity loss: 178 MW. Period: Nov 18, 2026 – Nov 18, 2026.

Messaure kraftverk back online after maintenance

Messaure kraftverk (428 MW hydropower) is back online after maintenance.

2 — planned maintenance Nov 18, 2026 – Nov 18, 2026

2 (253 MW wind power) is operating at reduced capacity. Capacity loss: 123 MW. Period: Nov 18, 2026 – Nov 18, 2026.

Messaure kraftverk — planned maintenance Nov 18, 2026 – Nov 18, 2026

Messaure kraftverk (428 MW hydropower) is taken offline. Capacity loss: 428 MW. Period: Nov 18, 2026 – Nov 18, 2026.

← Tilbake til kartet