Seitevare Kraftstation back online after maintenance

Seitevare Kraftstation (201 MW hydropower) is back online after maintenance.

Värtaverket back online after outage

Värtaverket (130 MW biomass) is back online after outage.

Seitevare Kraftstation — planned maintenance May 03, 2026 – May 03, 2026

Seitevare Kraftstation (201 MW hydropower) is taken offline. Capacity loss: 201 MW. Period: May 03, 2026 – May 03, 2026.

Värtaverket — unplanned outage May 03, 2026 – May 03, 2026

Värtaverket (130 MW biomass) is taken offline. Capacity loss: 130 MW. Period: May 03, 2026 – May 03, 2026.

Kallamossen back online after maintenance

Kallamossen (374 MW wind power) is back online after maintenance.

Kallamossen — planned maintenance May 01, 2026 – May 01, 2026

Kallamossen (374 MW wind power) is operating at reduced capacity. Capacity loss: 157 MW. Period: May 01, 2026 – May 01, 2026.

Solar power hits 2026 Sweden-wide high: 2376 MW

Total solar power production in Sweden reached 2376 MW, the highest so far this year (previous high: 2372 MW, +0.1%).

Solar power hits 2026 Sweden-wide high: 2363 MW

Total solar power production in Sweden reached 2363 MW, the highest so far this year (previous high: 2349 MW, +0.6%).

Porsi Kraftstation back online after outage

Porsi Kraftstation (100 MW hydropower) is back online after outage.

Porsi Kraftstation — unplanned outage Apr 30, 2026 – Apr 30, 2026

Porsi Kraftstation (100 MW hydropower) is taken offline. Capacity loss: 100 MW. Period: Apr 30, 2026 – Apr 30, 2026.

Vietas Kraftstation back online after outage

Vietas Kraftstation (162 MW hydropower) is back online after outage.

Vietas Kraftstation — unplanned outage Apr 30, 2026 – Apr 30, 2026

Vietas Kraftstation (162 MW hydropower) is taken offline. Capacity loss: 162 MW. Period: Apr 30, 2026 – Apr 30, 2026.

Åndberg Vind AB plant back online after maintenance

Åndberg Vind AB plant (286 MW wind power) is back online after maintenance.

Forsmark 1 back online after maintenance

Forsmark 1 (1100 MW nuclear power) is back online after maintenance.

Vietas Kraftstation back online after outage

Vietas Kraftstation (162 MW hydropower) is back online after outage.

Vietas Kraftstation — unplanned outage Apr 28, 2026 – Apr 28, 2026

Vietas Kraftstation (162 MW hydropower) is taken offline. Capacity loss: 162 MW. Period: Apr 28, 2026 – Apr 28, 2026.

Forsmark 1 — planned maintenance Apr 28, 2026 – Apr 28, 2026

Forsmark 1 (1100 MW nuclear power) is operating at reduced capacity. Capacity loss: 620 MW. Period: Apr 28, 2026 – Apr 28, 2026.

Stor-Skälsjön Vind AB plant back online after maintenance

Stor-Skälsjön Vind AB plant (260 MW wind power) is back online after maintenance.

Stor-Skälsjön Vind AB plant — planned maintenance Apr 26, 2026 – Apr 26, 2026

Stor-Skälsjön Vind AB plant (260 MW wind power) is operating at reduced capacity. Capacity loss: 172 MW. Period: Apr 26, 2026 – Apr 26, 2026.

Letsi kraftverk back online after outage

Letsi kraftverk (146 MW hydropower) is back online after outage.