Solar power hits 2026 Sweden-wide high: 2457 MW

Total solar power production in Sweden reached 2457 MW, the highest so far this year (previous high: 2418 MW, +1.6%).

Karlshamnsverket back online after outage

Karlshamnsverket (335 MW gas) is back online after outage.

Porsi Kraftstation back online after maintenance

Porsi Kraftstation (273 MW hydropower) is back online after maintenance.

Öresundsverket — planned maintenance May 07, 2026 – May 08, 2026

Öresundsverket (450 MW gas) is taken offline. Capacity loss: 450 MW. Period: May 07, 2026 – May 08, 2026.

Porsi Kraftstation — planned maintenance May 07, 2026 – May 07, 2026

Porsi Kraftstation (273 MW hydropower) is operating at reduced capacity. Capacity loss: 113 MW. Period: May 07, 2026 – May 07, 2026.

Kilforsen — planned maintenance May 07, 2026 – May 08, 2026

Kilforsen (272 MW hydropower) is operating at reduced capacity. Capacity loss: 187 MW. Period: May 07, 2026 – May 08, 2026.

Ligga back online after outage

Ligga (173 MW hydropower) is back online after outage.

Ligga — unplanned outage May 06, 2026 – May 06, 2026

Ligga (173 MW hydropower) is taken offline. Capacity loss: 173 MW. Period: May 06, 2026 – May 06, 2026.

Trängslet back online after outage

Trängslet (100 MW hydropower) is back online after outage.

Trängslet — unplanned outage May 06, 2026 – May 06, 2026

Trängslet (100 MW hydropower) is taken offline. Capacity loss: 100 MW. Period: May 06, 2026 – May 06, 2026.

Öresundsverket back online after maintenance

Öresundsverket (450 MW gas) is back online after maintenance.

Öresundsverket — planned maintenance May 04, 2026 – May 05, 2026

Öresundsverket (450 MW gas) is taken offline. Capacity loss: 450 MW. Period: May 04, 2026 – May 05, 2026.

Ligga back online after maintenance

Ligga (320 MW hydropower) is back online after maintenance.

Ligga — planned maintenance May 04, 2026 – May 04, 2026

Ligga (320 MW hydropower) is operating at reduced capacity. Capacity loss: 145 MW. Period: May 04, 2026 – May 04, 2026.

Gallejaur — unplanned outage May 04, 2026 – May 08, 2026

Gallejaur (101 MW hydropower) is taken offline. Capacity loss: 101 MW. Period: May 04, 2026 – May 08, 2026.

Gallejaur — planned maintenance May 04, 2026 – May 08, 2026

Gallejaur (207 MW hydropower) is taken offline. Capacity loss: 207 MW. Period: May 04, 2026 – May 08, 2026.

Trängslet — unplanned outage May 04, 2026 – Jun 05, 2026

Trängslet (100 MW hydropower) is taken offline. Capacity loss: 100 MW. Period: May 04, 2026 – Jun 05, 2026.

Trängslet — planned maintenance May 04, 2026 – Jun 05, 2026

Trängslet (330 MW hydropower) is taken offline. Capacity loss: 330 MW. Period: May 04, 2026 – Jun 05, 2026.

Seitevare Kraftstation — planned maintenance May 04, 2026 – May 13, 2026

Seitevare Kraftstation (201 MW hydropower) is taken offline. Capacity loss: 201 MW. Period: May 04, 2026 – May 13, 2026.

Ringhals 3 — planned maintenance May 04, 2026 – Jul 23, 2026

Ringhals 3 (1063 MW nuclear power) is taken offline. Capacity loss: 1063 MW. Period: May 04, 2026 – Jul 23, 2026.

← Back to map