468 articles
Total solar power production in Sweden reached 2457 MW, the highest so far this year (previous high: 2418 MW, +1.6%).
Karlshamnsverket (335 MW gas) is back online after outage.
Porsi Kraftstation (273 MW hydropower) is back online after maintenance.
Öresundsverket (450 MW gas) is taken offline. Capacity loss: 450 MW. Period: May 07, 2026 – May 08, 2026.
Porsi Kraftstation (273 MW hydropower) is operating at reduced capacity. Capacity loss: 113 MW. Period: May 07, 2026 – May 07, 2026.
Kilforsen (272 MW hydropower) is operating at reduced capacity. Capacity loss: 187 MW. Period: May 07, 2026 – May 08, 2026.
Ligga (173 MW hydropower) is back online after outage.
Ligga (173 MW hydropower) is taken offline. Capacity loss: 173 MW. Period: May 06, 2026 – May 06, 2026.
Trängslet (100 MW hydropower) is back online after outage.
Trängslet (100 MW hydropower) is taken offline. Capacity loss: 100 MW. Period: May 06, 2026 – May 06, 2026.
Öresundsverket (450 MW gas) is back online after maintenance.
Öresundsverket (450 MW gas) is taken offline. Capacity loss: 450 MW. Period: May 04, 2026 – May 05, 2026.
Ligga (320 MW hydropower) is back online after maintenance.
Ligga (320 MW hydropower) is operating at reduced capacity. Capacity loss: 145 MW. Period: May 04, 2026 – May 04, 2026.
Gallejaur (101 MW hydropower) is taken offline. Capacity loss: 101 MW. Period: May 04, 2026 – May 08, 2026.
Gallejaur (207 MW hydropower) is taken offline. Capacity loss: 207 MW. Period: May 04, 2026 – May 08, 2026.
Trängslet (100 MW hydropower) is taken offline. Capacity loss: 100 MW. Period: May 04, 2026 – Jun 05, 2026.
Trängslet (330 MW hydropower) is taken offline. Capacity loss: 330 MW. Period: May 04, 2026 – Jun 05, 2026.
Seitevare Kraftstation (201 MW hydropower) is taken offline. Capacity loss: 201 MW. Period: May 04, 2026 – May 13, 2026.
Ringhals 3 (1063 MW nuclear power) is taken offline. Capacity loss: 1063 MW. Period: May 04, 2026 – Jul 23, 2026.