Messaure kraftverk (150 MW hydropower) is taken offline. Capacity loss: 150 MW. Period: Apr 10, 2026 – Apr 10, 2026.
Ligga (173 MW hydropower) is back online after outage.
Total solar power production in Sweden reached 2075 MW, the highest so far this year (previous high: 1999 MW, +3.8%).
Ligga (173 MW hydropower) is taken offline. Capacity loss: 173 MW. Period: Apr 09, 2026 – Apr 09, 2026.
Forsmark 3 (1172 MW nuclear power) is taken offline. Capacity loss: 1172 MW. Period: Apr 09, 2026 – Apr 10, 2026.
Forsmark 3 (1172 MW nuclear power) is back online after maintenance.
Ligga (173 MW hydropower) is back online after outage.
Total solar power production in Sweden reached 1991 MW, the highest so far this year (previous high: 1848 MW, +7.7%).
Forsmark 3 (1172 MW nuclear power) is operating at reduced capacity. Capacity loss: 1012 MW. Period: Apr 07, 2026 – Apr 09, 2026.
Forsmark 3 (1172 MW nuclear power) is back online after maintenance.
Gråberget (270 MW wind power) is back online after maintenance.
Kilforsen (272 MW hydropower) is back online after maintenance.
Gråberget (270 MW wind power) is operating at reduced capacity. Capacity loss: 54 MW. Period: Apr 07, 2026 – Apr 07, 2026.
Värtaverket (130 MW biomass) is back online after outage.
Kilforsen (272 MW hydropower) is taken offline. Capacity loss: 272 MW. Period: Apr 07, 2026 – Apr 07, 2026.
Värtaverket (130 MW biomass) is taken offline. Capacity loss: 130 MW. Period: Apr 07, 2026 – Apr 07, 2026.
Messaure kraftverk (428 MW hydropower) is operating at reduced capacity. Capacity loss: 113 MW. Period: Apr 07, 2026 – Apr 21, 2026.
Åndberg Vind AB plant (286 MW wind power) is back online after maintenance.
Harsprångets kraftverk (170 MW hydropower) is taken offline. Capacity loss: 170 MW. Period: Apr 07, 2026 – Apr 21, 2026.
Åndberg Vind AB plant (286 MW wind power) is taken offline. Capacity loss: 286 MW. Period: Apr 07, 2026 – Apr 10, 2026.